Originally only £50m was to be made available through the first, fast-track wave of funding. But the DCSF has said this was increased to £61.7m because of the quality of 21 of the bids received. The total pot now stands at £201.7m. It is understood a further 20 to 30 bids were rejected, but some of these have been pushed back into the main funding wave, known as the standard route and totalling around...